![]() The goal to render an all-concrete structure meeting the aesthetic standards for the State Capitol’s Special Design district was achieved through the extensive use of glass paneling and louvered facades. Project goals called for aesthetically pleasing exterior facades and hard/landscaping much of which was in the planning as the core structure’s cast-in-place concrete walls and floors were being built. The project was one in which Hawaiian Dredging demonstrated its capability as a General Contractor during simultaneous design and construction phases. ![]() The six-story, 410-stall controlled access structure was the first phase of a comprehensive development to support the city’s special vehicles requirements including emergency, police & fire, and various Department of Transportation divisions. Hawaiian Dredging performed as a Design-Build General Contractor for this innovative and state-of-the-art parking structure. (ac7)ĬOMPLAINT against USA (TRN) (Filing fee $402, Receipt number AUSFCC-7778625) (Copy Served Electronically on Department of Justice), filed by HAWAIIAN DREDGING CONSTRUCTION COMPANY, INC.Answer due by. Rule 7.1 Disclosure Statement, filed by HAWAIIAN DREDGING CONSTRUCTION COMPANY, INC. Notice of Random Assignment Pursuant to Rule 40.1(a) to Judge Carolyn N. NOTICE of Designation of Electronic Case. (Eike, Erik)Ĭonsent MOTION for Extension of Time until to File Answer re #1 Complaint,, filed by USA.Response due by. RESPONSE to #6 Consent MOTION for Extension of Time until to File Answer re #1 Complaint, Statement Of No Objection, filed by HAWAIIAN DREDGING CONSTRUCTION COMPANY, INC.Reply due by. ORDER granting #6 Motion for Extension of Time to Answer. This docket was last retrieved on February 14, 2023.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |